Total Arrears:
₹0.00
| Connection | Scheme / Lift Details | Bill → Due | Energy (kWh / kVAh) | Power Factor | Net Bill (₹) | Total Payable (₹) | Status Alert | Actions |
|---|---|---|---|---|---|---|---|---|
Registered Lift Meters Directory
Manage service connection parameters, contracted demand (CMD), voltage, and friendly tags| SCNO | Type | Consumer Name & Address | Department Hierarchy (CE / Circle / Division) | Category | CMD (kVA) | Latest Month | Latest Total Due (₹) | Latest PF | Friendly Lift Tag | Actions |
|---|---|---|---|---|---|---|---|---|---|---|
CE Irrigation
--
Circle
--
Division
--
Contracted Demand (CMD)
-- kVA
Peak Recorded MD
-- kVA
Supply Voltage
-- kV
Feeder / Substation
--
Latest Bill Date
--
Due Date
--
Capacity Economics & CMD Optimisation Suite
Two-way RMD vs CMD gap evaluation, wasted demand cost, penal over-draw audit & 24-month optimal capacity proposals
Wasted Demand Charges
₹0
Billed demand − RMD × Rate
Rate: ₹300 / kVA
24-Month Peak RMD
0 kVA
Proposed Optimal CMD: 0 kVA
Includes 15% operational buffer (Peak × 1.15)
CMD Reduction Savings
₹0 / yr
Monthly: ₹0
Capacity Derate: 0 kVA
Plant Load Factor
0.0%
kWh ÷ (CMD × 730 hrs)
Evaluating running efficiency...
Energy Consumption Progression
Monthly Apparent (kVAh) vs Active (kWh) Energy Draw
Apparent (kVAh)
Active (kWh)
Power Factor Trend & Benchmark
Monthly PF compliance vs TGSPDCL 0.90 / 0.95 thresholds
Recorded PF
0.95 Target
Billing Trajectory: Demand & Energy Charges vs Total Payable
Monthly Fixed Demand Charges & Variable Energy Draw compared to Cumulative Total Outstanding Dues
Demand Charges (₹)
Energy Charges (₹)
Total Payable (₹)
Avoidable Financial Drain & Arrears Horizon
Late payment charges (LPC) leakage, arrears scale in billing months, and Additional Consumption Deposit (ACD) liabilities
Late Payment Surcharge (LPC)
0% of Net Bill
₹0.00
FY Recorded Total: ₹0
Single biggest avoidable departmental bleed
Arrears Backlog Horizon
0 Months
Equivalent to ~0.0 Years of Billing
Communicates debt scale relative to active demand
ACD Liability & Surcharge
₹0
Accruing Surcharge: ₹0 / mo
Annual Surcharge Drain: ₹0 / yr
Tariff Integrity, Power Factor Loss & Meter Verification
Low-PF excess energy drain, rate variance checks against expected tariff, TOD incentives, and bill reconciliation assertions
Excess kVAh & ₹ Lost
₹0.00
0 Excess kVAh
Benchmark: 0.95 PF
Tariff Rate Variance
₹6.30 / kVAh
Expected: ₹6.30 (HT Cat-IV A)
✅ Tariff Compliant
Reconciliation Assertion
100% Match
Components == Net Bill
Verified across all line items
Meter Integrity Flag
Normal Reading
Reading Difference > 0
Verified against physical meter logs
TOD Incentive (Earned vs Foregone)
₹0.00
Off-peak shift potential
Night pumping slot incentives
Latest Month Tariff Charges Breakdown
Detailed line item composition from authentic TGSPDCL demand bill
Demand Charges
₹0.00
Energy Charges
₹0.00
Customer Charges
₹0.00
Electricity Duty (ED)
₹0.00
Current Net Bill Demand
₹0.00
Accumulated Arrears
₹0.00
Total Net Payable
₹0.00
Operational & Capacity Diagnostics
Connected load, power factor penalty status & capacitor recommendations
CMD Capacity Load
0%
Peak RMD: 0 kVA
Contracted: 0 kVA
Healthy Power Factor
Power factor is within compliant limits. Capacitors functioning properly.
Scheme Monthly Billing Cycles Ledger
All authenticated TGSPDCL demand records for this scheme| Billing Month | Bill Date | Due Date | Active (kWh) | Apparent (kVAh) | Power Factor | Recorded MD | Demand Charges (₹) | Energy Charges (₹) | Late Surcharge (LPC) | Net Demand (₹) | Total Payable (₹) | Audit & Notice |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Select a scheme to view monthly cycle history | ||||||||||||